Product

Pulling type hot-reclaimed Maintenance car claimed Maintenance car HOTBOX-S1000-I

Old material regeneration, cold material heating, new material mixing and other functions. Old material regeneration, cold material heating, new material mixing and other functions.Our primary objective is usually to offer our shoppers a serious and responsible small business relationship, offering personalized attention to all of them for OEM Supply Excellent Performance Asphalt Heater, It is our wonderful honor to satisfy your needs.We sincerely hope we are able to cooperate along with you from the in the vicinity of future.


Product Detail

PRODUCT PARAMETER

Product Tags

Rapid heating and stirring

Asphalt Mixture Recycling

Hot Asphalt Heating and Insulation

Ready to ship

HOTBOX-S1000-I

HOT-RECLAIMED COMPREHENSIVE MAINTENANCE CAR (TRAILER)

HOTBOX-S1000-I trailer-mounted thermal regeneration maintenance vehicle is a professional comprehensive asphalt road thermal regeneration repair equipment. Mainly consists of power system and electric control system,walking system (trailer chassis), drum silo mixing system, hot asphalt heating and heat preservation and adding system, smoke filter system,drum silo hot air circulation heating system,  emulsified asphalt spraying system (optional),  etc.

OEM Supply China Pothole Repair Asphalt Heater and Construction Machinery, Our solutions are widely recognized and trusted by users and can meet continuously developing economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!

HOTBOX-S1000-I1 (1)

Before 

HOTBOX-S1000-I1 (2)

After

HOTBOX-S1000-I

PRODUCT DESCRIPTION (5)

● Higher heating efficiency

The drum of the equipment adopts the hot air circulation heating mode to ensure that the heating air flow can directly and effectively heat the asphalt mixture, and cooperate with the drum mixing function to achieve the uniform heating of the asphalt mixture and improve the heating efficiency. The first heating time is 20-25min, and the continuous heating time is 15-20min, hot asphalt mixture can be produced quickly in the construction site, and materials can be provided for repairing pavement diseases in time.

● Hot asphalt heating hose

It is equipped with 4.8m hot asphalt heating hose, which is used for the transportation of hot asphalt. The temperature is accurately controlled by the temperature controller to ensure that the temperature of asphalt does not decrease during the filling process and to avoid the asphalt solidification in the hose.

● Stable and efficient burner

Diesel burner adopts imported brand RIELLOto ensure more stable operation and higher heating efficiency.

● Filtering and dedusting device

The equipment is equipped with a whirlwind dust removal filter system, which can filter the smoke and dust generated inside the drum and enter the drum again. This can not only prevent the dust from polluting the environment, but also avoid heat loss, reduce the heating time of the asphalt mixture, and improve the heating efficiency.

PRODUCT DESCRIPTION (3)
PRODUCT DESCRIPTION (4)

● Powerful, durable and stable

The equipment uses high-performance generator set (KOHLER engine imported from the United States) to provide power to the whole equipment (220/380V), so that the equipment has a continuous power input, strong power generator set, stable voltage and power output, while Low engine fuel consumption. The equipment has a long service life and lower cost.

● Convenient transportation

The equipment adopts trailer chassis, which makes transportation more convenient. At the same time, it is equipped with professional truck tires and service brake devices to ensure the safety of trailer driving.

PRODUCT DESCRIPTION (1)

CONSTRUCTION PROCESS

施工-1

The pits and grooves have been eroded by rain for a long time, which has caused road damage more and more.

施工-2

Crush the pits and grooves, put the waste asphalt into the equipment for constant temperature heating and regeneration.

施工-3

Spray emulsified asphalt, regenerate the finished asphalt mixture, pave the pit and flatten it.

施工-4

Effectively prevent rain erosion for 3-5 years after pavement repair.

CONSTRUCTION (2)

① Crush the damaged asphalt pavement

CONSTRUCTION (4)

② Recycled old material from hopper to roller heating box

CONSTRUCTION (3)

③ Set temperature for heating and regeneration

CONSTRUCTION (6)

⑤ Compacted asphalt

CONSTRUCTION (5)

④ Discharge and pave

CONSTRUCTION (1)

⑥ Patching complete

SCOPE OF APPLICATION

It can be used to repair potholes, ruts, oil bags, cracks, damaged roads around manhole covers, etc.

SCOPE OF APPLICATION (4)

Sinking

SCOPE OF APPLICATION (2)

Loose

SCOPE OF APPLICATION (3)

Cracked

SCOPE OF APPLICATION

Pothole

SCOPE OF APPLICATION (7)

Highways

SCOPE OF APPLICATION (6)

National roads

SCOPE OF APPLICATION (1)

Urban roads

SCOPE OF APPLICATION (5)

Airports


  • Previous:
  • Next:

  • PRODUCT PARAMETERS
    Product model HOTBOX-S1000-I
    Dimensions 5020x2040x1960MM
    Total Weight 3400KG
    Roller volume 1000L
    Generator set maximum power 16.5KVA
    Write your message here and send it to us