See More
Before Repair
After Repair
1. The cracks have been eroded by rainwater for a long time, which makes the road damage more serious.2. Using pavement router to
open 1~2 cm standard incision to ensure the effect of filling.
3. Use jointing equipment to better fill the sealant to the cracks.
4. 3-5 years after crack repair can effectively prevent rainwater erosion.
1. crack slotting
2.Crack cleaning
3.Crack repair
4.Patching complete
The equipment is specially used for repairing the cracks of asphalt pavement such as expressway, national provincial road, county and township road, urban road and airport pavement, and etc.
Want to know more products >>Contact us
Expressway
Urban Road
Airport
Pavement
Get more details and quotes for products
Efficiency
Danger when open fire heating. Materials are easy to aging without temperature control system. Low efficiency and it may cause redone.
Efficiency
Imported temperature control system to ensure accurate temperature.Fast repair speed, good effect and longer service life.
Effect
Crack filling by hand is not uniform, and it is easy for water drops to leak. If the road is not protected, it will cause more serious damage.
Effect
Eromei Crack Sealer using air pressure gun for filling,better results and the road is 3-6 times more durable than the manual filling.
Cost
Manual joint filling requires a large number of hands to cooperate with the construction, which is slow in efficiency.
Cost
1-2 people can do the construction, reduce the labor intensity, efficient and labor-saving, saving 30-60% of the cost.
Stable and durable
The core components are imported from the original, quality assurance.
bowels are durable
The discharge hose with high resistance to bending fully meets the needs of road strength construction
Yanmar engine
Mature imported core power Stable and reliable
Lightweight and easy to operate
Small size, light weight, strong mobility and high work efficiency.
Vacuum tire
Torsion spring damping device makes walking more stable and comfortable
Multipurpose
One machine is multi-purpose, and has multiple functions such as joint filling, hot asphalt melting and spraying.
DEVICE PARAMETERS | |
Model: | CSM-C100 |
Dimensions: | 1750(2150) x1050 x 1620mm L x W x H |
Net Weight: | 350KG |
Tank Volume: | 100L |
Melting Time: | 40min/60kg |
Trailer Tires: | Automotive tires |
Engine | |
Generator: | Yamaha (EF2600FW) |
Start-up Mode: | Manual |
Rotation Speed: | 3000r/min |
Rated Power: | 2.0 KVA |
Fuel: | Gasoline |
Fuel Tank Capacity: | 9L |
Advantages in Performance: | High performance generator, operating stably and reliably, with low noise and low pollution. |
Feeding System | |
Material Pump: | Flow: 10L/min Pressure: 0.08MPa |
Material Pump Motor: | 0.2KW, speed regulating motor |
Stirrer Motor: | 0.25 KW, constant speed motor |
Automatic Thermostat System: | |
Thermostat: | Omron, Japan |
Thermocouple | Imported K-type thermocouple |
Heat Transfer Oil: | L-QBB320 Great Wall L-QBB320 |
Heat Transfer Oil Volume: | 20L |
Electric Heating Hose and Burner | |
Burner: | Riello 220V 50KW / h |
Electric Heating Hose: | 220V hose made in China, 4m in length |
Fuel oil: | 0 # Diesel Oil |
Diesel Tank Volume: | 20L |
A1, Building 3, No.6 Jingye Road, Torch Development Zone, Zhongshan City, Guangdong Province, China
TEL : +86-760-8870 8760 +86-760-8887 2700
FAX : + 86-760-8887 2711
E-mail : service@eromeigroup.com
International Sales Division:
Contact : Nicole Lin WeChat ID:139 249 66667
MOB : +86-139 249 66667
Email : sales@eromeigroup.com